The scope of work comprises geophysical logging of the DeepStor-1 well after Section II has been cased and cemented and Section IIIa has been drilled. In the fol-lowing, we give the gene-ral conditions of the work before detailing the logging tasks to be performed with the associated technical conditions. Weitere Details siehe Appendix A_Logging_Specification for services